Demolition contractor for Mountain View and Santa Clara County

Request a demolition quote →
Get a Quote
Salvaged bricks and blocks (Mountain View Demolition Pros)

Mountain View salvage and deconstruction

Deconstruction and Salvage in Mountain View

Instead of crushing a building, deconstruction unbuilds it, last-in first-out, so the lumber, doors, fixtures and brick survive for reuse. It is slower than a machine teardown and saves much more.

Why Deconstruct Instead of Demolish in Mountain View

Mountain View's oldest houses, mostly in Old Mountain View and the blocks near downtown, were built with lumber that is hard to find today: dense, old-growth redwood and fir, tight-grained and straight. Many also have original doors, windows, hardware, built-in cabinets, clawfoot tubs and brick chimneys. A machine teardown sends all of that to recycling or landfill as mixed debris.

Deconstruction saves those materials. Some owners want to reuse them in the new house, like redwood siding turned into an accent wall or old doors rehung. Others donate them to building material reuse groups or sell them. And some simply want the building to come down with as little waste as possible.

Garages and sheds can be good deconstruction candidates too. A detached garage behind a bungalow on Mercy Street or Church Street may be framed in the same old redwood as the house, and it is small enough to take apart by hand in a few days before an ADU goes in.

Stacked lumber in a yard (Mountain View Demolition Pros)

How Building Deconstruction Works

Deconstruction generally goes from the inside out and top down. First come fixtures, cabinets, doors, windows, trim and anything else that can be removed whole. Then roofing, followed by roof framing, walls and floor framing, with nails pulled and lumber stacked by size and type. The foundation is usually removed by machine at the end.

Full deconstruction of a whole house takes much longer than demolition and needs more labor. A common middle ground is partial salvage: we pull the most valuable items by hand, then finish with a machine teardown. That keeps cost and time closer to a regular demolition while still saving the best material.

Salvaged materials are stored on site briefly, then moved to you, to a reuse organization, or to a buyer, depending on your plan.

Asbestos and Lead Before Salvage

Older materials are the ones most worth saving, and also the ones most likely to have lead paint or asbestos. Before deconstruction begins, the building gets an asbestos survey like any demolition. Any asbestos-containing materials are removed by a certified abatement contractor first. We coordinate that work, but we are not the abatement contractor.

Painted wood, windows and doors from before 1978 likely have lead paint. That does not mean they cannot be reused, but they should be handled and refinished carefully. We let you know which salvaged pieces are painted so you or the next owner can plan for that.

Stack of salvaged lumber (Mountain View Demolition Pros)

Permits and Recycling Credit for Deconstruction

A deconstruction job is permitted exactly like a teardown, with a Mountain View demolition permit and the air district notice. Utilities are disconnected the same way. In Los Altos, the permit comes from that city's building division.

Salvaged and reused materials count toward the CALGreen construction waste diversion requirements, often making it easy to exceed the required percentage. We document what was salvaged, recycled and disposed of for your permit closeout.

Deconstruction Cost Compared With Demolition

Deconstruction usually costs more in labor than a machine teardown because it takes longer. Some of that can be offset by lower disposal costs and, when materials are donated to qualified nonprofits, possible tax benefits that your tax advisor can explain. The value of the salvaged material itself depends on its condition and the market.

The biggest cost factors are how much of the building is taken apart by hand, the age and quality of the materials, how much is painted or damaged, and access for storing and moving salvage on a small lot.

Mountain View Deconstruction Scope

01

Salvage List Before Deconstruction Starts

Together we tour the building and note each item worth keeping, from lumber and doors to fixtures and brick, and decide where each item goes.

02

Hand Dismantling of Salvage Items

Fixtures, cabinets, doors, windows, flooring and framing are removed by hand, de-nailed and stacked, without the damage a machine causes.

03

Machine Demolition of the Remainder

After salvage, the remaining structure and foundation come down by machine, and the lot is cleared and graded.

04

Salvage and Recycling Documentation

We record what was salvaged, recycled and disposed of, which helps with CALGreen reporting and donation records.

Deconstruction: Job Site Photos

Demolition FAQs

Deconstruction Questions in Mountain View

Is deconstruction worth it for an old Mountain View house?

It depends on the materials. Houses with old-growth redwood framing, original doors and fixtures, or good brick are the best candidates. Newer houses with plywood and drywall have less to save.

How long does deconstruction take compared with demolition?

Usually several times longer. A machine teardown may take a few days, while full deconstruction of the same house can take a few weeks. Partial salvage falls in between.

Can I keep the salvaged materials?

Absolutely. Old redwood, interior doors and light fixtures often end up back in the new house. We stack and protect them on site or deliver them where you want.

Does deconstruction need a different permit?

No. It uses the same demolition permit and air district notice as a regular teardown. The work method is what changes.

Skid steer loader moving dirt on a job site (Mountain View Demolition Pros)

Demolition quote

Price a Deconstruction or Salvage Job in Mountain View

Share roughly when the building went up and which pieces you hope to keep, from framing lumber to doors and brick. We reply within 24 hours.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote