
Clearing Mountain View building lots
Lot Clearing and Site Prep in Mountain View
We clear lots of brush, stumps, fences, old concrete and buried junk, then rough-grade the ground so the surveyor, soils engineer and builder can get to work.
Lot Clearing After a Mountain View Teardown
In a built-out city like Mountain View, there is almost no raw land left. Most site clearing happens after a demolition, or on a lot where an old house came down years ago and the yard has gone wild. The job is to take the lot from messy to buildable: overgrown shrubs and ivy, dead fruit trees from the orchard era, old fences, broken walkways, buried pipe and the scraps every old property collects.
Clearing is the step that turns a demolition into a building site. We pick up after the main teardown, finding and removing the footings, pipes, old septic remnants or buried trash that show up once the ground is opened, and leave the pad clean and roughly level.

Brush, Stump and Root Removal Near Protected Trees
Many Mountain View lots have large oaks, redwoods, sycamores and other trees, some of them protected under the city's Heritage tree rules. Los Altos has its own tree protection ordinance. Before clearing, we confirm which trees stay and what protection they need. Clearing near protected trees often means hand work inside the root zone, fencing at the drip line, and following the project arborist's directions.
Trees and stumps that are approved for removal are taken out, with stumps ground or pulled depending on what will be built there. Brush, ivy and green waste are hauled separately so they can go to composting instead of landfill.
If your project needs a tree removal permit, the arborist or your designer usually files it. We do not remove protected trees until the approval is in hand.
Rough Grading and Site Prep Before Building
After clearing, the lot is rough-graded to drain properly and match the plans. That might mean cutting down high spots, filling low ones, removing loose fill left from old work, or shaping a pad for the new foundation. Fine grading and compaction for the foundation itself are typically done by the builder's grading contractor once the surveyor stakes the house.
On former industrial or commercial land, such as some parcels in East Whisman, soil may need testing before it is moved or exported. When an environmental consultant is involved, we follow their soil handling plan.

Larger Site Clearing in North Bayshore and Whisman
On redevelopment sites in North Bayshore and East Whisman, clearing covers much more ground. Landscaped campus grounds, irrigation systems, light poles, signs, fences, utility vaults and acres of paving all come out before the new project breaks ground.
These jobs need erosion control and storm water protection, because the bay and its creeks are close by. We install inlet protection and perimeter controls, keep tracking off public streets, and coordinate with the project's storm water plan.
What Drives Lot Clearing Cost in Mountain View
The size of the lot and how overgrown it is set the base. Then come stumps and roots, buried concrete or debris, how much material goes to green waste versus mixed debris, access for equipment, and the grading needed. Tree protection near large Heritage trees adds hand work and time.
We look at the lot in person, walk it with your plans if you have them, and price each part of the clearing separately so you can see where the work is.
What Our Lot Clearing Includes in Mountain View
Brush, Ivy and Green Waste Removal
Overgrown shrubs, ivy, weeds and dead trees are cleared and hauled separately as green waste so they can be composted rather than buried.
Stump Grinding and Root Removal
Approved stumps are ground or pulled, with roots removed to the depth needed for new foundations, paving or landscaping.
Buried Debris and Old Flatwork Removal
Old footings, pipes, walkways, fence posts and buried trash are dug out so the builder does not hit them later.
Rough Grading for Site Prep
The lot is shaped to drain and roughly match the plans, ready for survey, soils testing and the builder's foundation crew.
Lot Clearing: Job Site Photos



Lot Clearing and Site Prep Across Mountain View
Demolition FAQs
Mountain View Lot Clearing FAQ
Do I need a permit for lot clearing in Mountain View?
General clearing of brush and debris usually does not need its own permit. Removing protected trees does, and grading over certain amounts may need a grading permit. If the clearing is part of a demolition or new building, it falls under those permits.
Can the lot be cleared without hurting the trees I am keeping?
Yes. We fence the root zone, work by hand near trees and follow your arborist's instructions so the trees you are keeping stay healthy.
What happens to the green waste?
Brush, branches and ivy are hauled separately to green waste recycling, where they are composted or turned into mulch.
How long does lot clearing take?
A typical residential lot takes one to a few days. Large or heavily overgrown sites, or campus redevelopment parcels, take longer.
Do you do fine grading for the foundation?
We do rough grading. Fine grading and compaction for the foundation are usually handled by the builder's grading contractor after the house is staked.

Demolition quote
Price Lot Clearing or Site Prep in Mountain View
Describe the lot, what is on it today and what is going up next. A reply comes inside a day so we can book a walk of the lot.
- Permits
- Demolition
- Haul-off
