
Kitchen demolition in Mountain View
Kitchen Demolition in Mountain View
We strip old kitchens down to studs and subfloor so the remodel can start on schedule. Cabinets, counters, appliances, tile and soffits come out, and the rest of the house stays clean.
Kitchen Tear-Outs in Mountain View Homes
Kitchens are the most common partial demolition we do in Mountain View. The houses here range from 1920s bungalows with small closed-off kitchens to 1950s and 1960s ranch and tract homes with dropped soffits, tile counters and laminate floors over older vinyl. Most remodels open the kitchen to the living area, which means a wall or two comes out along with everything else.
Owners in Cuesta Park and Waverly Park often redo the kitchen in a house they plan to stay in for years, sometimes while living in it. In Monta Loma Eichlers the kitchen sits in the middle of an open plan, so the dust has nowhere to hide unless it is contained well.

What Comes Out in a Kitchen Demolition
A full kitchen demolition usually removes upper and lower cabinets, countertops and backsplash, the sink and disposal, appliances, soffits, light fixtures, the floor down to subfloor or slab, and drywall or plaster where new plumbing or wiring has to run. Some owners donate cabinets or appliances that still work, and we can take them out carefully when that is the plan.
We leave gas and water lines capped and the electrical made safe, with circuits marked so the electrician can pick up from there. Walls that are coming out are only removed after your contractor confirms they are not bearing or the new beam is designed.
Rowhouse and townhome kitchens built in the last twenty years are a different job again. They are smaller, built with drywall and thin-set tile, and come out quickly, but the HOA rules on noise and debris staging usually set the pace.
- Cabinets, counters, backsplash and soffits
- Sink, disposal, range, hood and dishwasher
- Tile, vinyl or wood flooring to subfloor
- Drywall or plaster where the plans call for it
- Non-bearing walls opened for the new layout
Asbestos in Older Kitchen Materials
Old kitchens hide a lot of asbestos. Vinyl floor tile and the black mastic under it, sheet flooring backing, drywall joint compound, textured ceilings and some old backsplash adhesives were all made with it for decades. Before we start, those materials are sampled. Positive results go to a certified abatement firm working under containment, and our crew follows after clearance.
Kitchens in pre-1978 houses may also have lead paint on trim, doors and walls. We cut and scrape those surfaces using lead-safe practices with plastic, misting and HEPA cleanup.

Kitchen Demolition Cost and Timing in Mountain View
A typical kitchen tear-out takes one to three days once testing is done. What moves the cost is the size of the room, plaster versus drywall, tile set in a mortar bed versus thin-set, how many walls are opening up, whether the house is occupied and needs heavy dust control, and whether abatement is needed first.
Access counts too. A kitchen at the back of a narrow Old Mountain View house means carrying every load down a hallway and out the front, while a ranch house with a side door and a driveway right outside is quicker. We look at the route during the walkthrough.
What Our Kitchen Demolition Includes in Mountain View
Testing Before the Kitchen Tear-Out
Flooring, mastic, joint compound and ceiling texture are sampled, with positive material cleared by certified abatement before we begin.
Containment for the Rest of the House
Plastic walls, covered vents and a protected path to the door keep dust in the kitchen, even in open-plan homes where the kitchen faces the living room.
Capped Gas and Water After Kitchen Demo
Gas and water lines are shut and capped and electrical made safe, so the plumber and electrician can start rough-in without hunting for live lines.
Same-Day Kitchen Debris Haul-Off
Cabinets, counters and debris leave the property at the end of each day. Metal and appliances go to recyclers, and nothing sits in the driveway overnight.
Kitchen Demolition: Job Site Photos



Kitchen Demolition Across Mountain View
Demolition FAQs
Mountain View Kitchen Tear-Out FAQ
How long does kitchen demolition take?
Usually one to three days for the tear-out itself. Add time before that if testing finds asbestos and a certified contractor has to remove it first.
Can I stay in the house during kitchen demolition?
Many owners do. We seal the kitchen off with plastic walls and protect the path out of the house. It is noisy during work hours, but the rest of the house stays usable.
Can the old cabinets or appliances be saved for donation?
Yes, if you tell us beforehand. We remove them carefully instead of breaking them out, and set them aside for donation, resale or reuse.
Do I need a permit for kitchen demolition?
Your remodel permit covers it. Mountain View issues it for Mountain View addresses, Los Altos for Los Altos ones. We do not start until that permit is in hand.
Who disconnects the gas range?
We shut the valve, disconnect the range and cap the line. If the gas line itself is being moved, your plumber handles the new run.

Demolition quote
Get a Kitchen Demolition Quote in Mountain View
Sketch out the kitchen, what goes and whether the family stays in the house through the remodel. We reply by phone or email within 24 hours.
- Permits
- Demolition
- Haul-off
